Check the Lake

Amistad Reservoir Water Level Today

Amistad Reservoir, Texas · Val Verde County

Lake level now
1,070.37ft
above sea level
46.6 ft below full 53.6% full
Daily reading, Nov 24, 2026 · Texas Water Development Board
+0.03ft in 24 hours
+0.46ft in 7 days
+7.59ft in 30 days
+14.0ft from a year ago

Amistad Reservoir is 46.6 feet below full pool and 54% full, below normal for late November. It is higher than 8 of the last 58 years on this date. The lake is 14.0 feet higher than a year ago. Over the next month the level usually holds about steady.

ShareXWhatsAppFacebookReddit

Is Amistad Reservoir high or low for this time of year?

The darker band is where the lake usually sits on each date, the middle half of the last 30 years, and the light band runs from the lowest to the highest. Today the lake is below normal, against a typical 1,075.9 to 1,107.6 feet for late November.

1,0601,0801,1001,120JanMarMayJulSepNovFull pool 1,117
2026Typical rangeLowest to highestFull pool

Amistad Reservoir level over the last 30 days

Daily readings show the lake up 7.54 feet since Oct 25.

1,064.01,066.01,068.01,070.0Oct 25Nov 23

Amistad Reservoir level on November 24 in past years

Each dot is one year's level on this date. This year's 1,070.4 ft is higher than 8 of 58 past years. The lowest was 1968 at 1,045.9 ft and the highest was 1974 at 1,126.8 ft.

Full pool20261968 low1974 high

How full has Amistad Reservoir been each month?

Darker means fuller. The lake dropped below 60% full in 11 of the last 20 years, most recently in 2026. The emptiest month was July 2024 at 24%.

JFMAMJJASOND20262025202420232022202120202019201820172016201520142013201220112010200920082007
Under 30 30 to 50 50 to 65 65 to 80 80+% full

When does Amistad Reservoir usually rise and fall?

On average the lake gains the most in September, +2.6 feet, and loses the most in May, −2.0 feet.

−2.00.0+2.0JFMAMJJASOND

Amistad Reservoir record high and low

The highest daily level in the last 58 years was 1,135.6 ft in September 1974, 18.6 feet above full pool. The lowest was 913.3 ft in June 1968, 203.7 feet below full pool.

9501,0001,0501,1001976198419922000200820162024Full pool 1,117High 1,135.6 (1974)Low 913.3 (1968)

About Amistad Reservoir and Amistad Dam

Dam
Amistad Dam
Completed
1969
River
Rio Grande
Owner
International Boundary and Water Commission and Mexico Comision Internacional de Limites y Aguas
Normal storage
3,384,000 acre-feet
Surface area
89,000 acres
Dam height
287 ft
Full pool
1,117.0 ft

Amistad Reservoir level by day

DateLevel (ft)Changevs full
Nov 23, 20261,070.37+0.03−46.63
Nov 22, 20261,070.34+0.03−46.66
Nov 21, 20261,070.31+0.13−46.69
Nov 20, 20261,070.18+0.06−46.82
Nov 19, 20261,070.12+0.07−46.88
Nov 18, 20261,070.05+0.07−46.95
Nov 17, 20261,069.98+0.07−47.02
Nov 16, 20261,069.91+0.08−47.09
Nov 15, 20261,069.83+0.10−47.17
Nov 14, 20261,069.73+0.12−47.27
Nov 13, 20261,069.61+0.14−47.39
Nov 12, 20261,069.47+0.25−47.53
Nov 11, 20261,069.22+0.69−47.78
Nov 10, 20261,068.53+1.08−48.47
Nov 9, 20261,067.45+0.40−49.55
Nov 8, 20261,067.05+0.20−49.95
Nov 7, 20261,066.85+0.08−50.15
Nov 6, 20261,066.77+0.10−50.23
Nov 5, 20261,066.67+0.13−50.33
Nov 4, 20261,066.54+0.17−50.46
Nov 3, 20261,066.37+0.39−50.63
Nov 2, 20261,065.98+0.49−51.02
Nov 1, 20261,065.49+0.60−51.51
Oct 31, 20261,064.89+0.99−52.11
Oct 30, 20261,063.90+0.76−53.10
Oct 29, 20261,063.14+0.19−53.86
Oct 28, 20261,062.95+0.03−54.05
Oct 27, 20261,062.92+0.05−54.08
Oct 26, 20261,062.87+0.04−54.13
Oct 25, 20261,062.83−54.17